An Entire World Called Kerala.
KERALA WORLDകേരളമെന്നൊരു ലോകം.
← Major Projects

2016–2026

Kochi Metro

An operating metro and its next stages

Metro train beside a station platform
A Kochi Metro train at Lissie station, October 2017. NidhinWiki · CC BY-SA 4.0 · Resized for display.

The report distinguishes operating early phases from a later construction programme and a further proposed corridor.

Kochi Metro’s completed phases

The March 2026 Planning Board report describes Kochi Metro Phases I, IA and IB as completed. This is not a later live-status update.

Phases I, IA and IB are described as completed.

Read the full article →

Kochi Metro Phase II: the December 2026 forecast

The March 2026 report forecasts the 11.2-km Kochi Metro Phase II from JLN Stadium to Infopark by December 2026. This source does not establish completion.

Phase II from JLN Stadium to Infopark is described as an 11.2-km extension expected by December 2026. This remains a forecast in this source.

Read the full article →

Kochi Metro Phase III: a proposal awaiting approval

In March 2026, the report describes a proposed 14-station Kochi Metro Phase III from Aluva to Angamaly, awaiting Union approval.

A 14-station Phase III from Aluva to Angamaly is described as proposed and awaiting Union approval.

Read the full article →
Explore the project timeline
  1. Union Cabinet approval

    Second Oommen Chandy ministry

  2. Foundation stone

    Second Oommen Chandy ministry

  3. Initial line inaugurated

    First Pinarayi Vijayan ministry

  4. Phase-I extension opened; Phase-II foundation

    Second Pinarayi Vijayan ministry

Kochi Metro developed through planning, construction and opening stages across governments. The same railway line remains one project as those stages advance.

Rail-metro operations from 2017 are distinct from Water Metro services introduced in 2023.

DISCOVER KERALA

Search Kerala World